Document extraction at scale, with provenance.
- Project №
- AIPE-0025
- Client
- Insurance
- Date
- 2025-11
- Class
- RESTRICTED
- Span
- 9 weeks
§ 01 — Brief
Multi-stage extraction pipeline with full provenance. Each output carries a signed trace back to source pages and source models.
The system was specified, built, and handed over. The trace format was the first artefact selected; the models were selected last.
§ 02 — Drafted
Architecture sheet retained on client premises. Public summary withheld.